Configuration, Testing, Commissioning ...

Go Back
Procurement Details

Raised Grievances

Every grievance filed against this reference, with the official GRC decision and the time it took to redress.

Configuration, Testing, Commissioning and Integration of ABB make Industrial Communication Gateway System/RTU with the Existing DCS for Signal/data transmission/ Interfacing of Khan Khwar Power Station with NGC/ISMO under SCADA-III Project.
0 Cases
0 Resolved
0 Rejected
Mr. Aman ullah
Convener

Resident Engineer

Department: General Manager Finance (Power) WAPDA

Email: reomdkp@yahoo.com

Login ID: F00232-33-00011

Phone: +92-332-400-5672

Mr. Zafar Hussain
Member

Executive Engineer

Department: Member (Power) WAPDA

Email: engr.zafar.shah@gmail.com

Login ID: F00229-33-00004

Phone: +92-333-051-7752

Mr. Shahzad Ahmed Bostan
Member

Executive Engineer

Department: Member (Power) WAPDA

Email: engr.shahzadbostan@gmail.com

Login ID: F00229-33-00005

Phone: +92-332-860-1775

No Grievance Raised

No grievances have been raised for this procurement.

# Name User ID Designation Department Email Phone Role
1 Mr. Tanvir Ahmad F00232-31-00008 Resident Engineer General Manager Finance (Power) WAPDA rekhankhwar.proc@gmail.com +92-333-580-6800 Convener
2 Mr. Amer saeed F00232-33-00009 Executive Engineer General Manager Finance (Power) WAPDA engr.amersaeed@gmail.com +92-344-529-0349 Member
3 Mr. Azam Mustafa khan F00232-33-00012 Deputy Director General Manager Finance (Power) WAPDA azam.khankhail@gmail.com +92-334-051-7812 Member
4 Mr. Nisar Ahmad Khan F00232-33-00026 Deputy Manager General Manager Finance (Power) WAPDA dm.3hhp.epads@gmail.com +92-323-726-6098 Member
5 Mr. shah saud F00229-33-00002 Assistant Executive Engineer Member (Power) WAPDA engr.saud328@gmail.com +92-344-913-3122 Member