Provisioning and Installation of Qty-02 New Under Vehicle Surveillance System (UVSS) at Main Entrance Gate of FIAP
1 Cases
0 Resolved
0 Rejected
Mr. Saadiq Ur Rehman
Convener

Deputy Director General

Department: Pakistan Airports Authority (PAA)

Email: ddg.paa@paa.gov.pk

Login ID: F00067-33-00001

Phone: +92-300-824-0038

Mr. Khizer Hayat Malik
Member

Additional Director

Department: Pakistan Airports Authority (PAA)

Email: khizer.malik69@gmail.com

Login ID: F00067-33-00002

Phone: +92-300-553-7331

Mr. Arslan Ghous
Member

Deputy Director

Department: Pakistan Airports Authority (PAA)

Email: arslanghous@paa.gov.pk

Login ID: F00067-33-00003

Phone: +92-312-288-3366

Pending

Grievance Against Restrictive Technical Specifications and Non-Provision of Pre-Bid Meeting/Site Survey in Tender for "Provisioning and Installation of Qty-02 New Under Vehicle Surveillance System (UVSS) at Main Entrance Gate of FIAP"

GR0-P51680-001 Submitted on Friday, July 10, 2026 02:21 AM Mr. ZAID REHMAN

After carefully reviewing the bidding documents, we have observed that the technical specifications appear to be highly restrictive and are drafted in a manner that effectively supports only a specific manufacturer's product rather than encouraging fair and open competition. Such restrictive specifications discourage participation by other qualified manufacturers and authorized suppliers, which is against the spirit of the Public Procurement Rules (PPRA), requiring transparency, fairness, and maximum competition.

Furthermore, this procurement involves the installation of an Under Vehicle Surveillance System (UVSS), including civil works, electrical works, trenching, inductive loop installation, integration, and commissioning. A detailed site survey is essential for preparing an accurate technical and financial proposal. However, the bidding documents do not provide any schedule for a mandatory or optional site visit, nor do they specify a pre-bid meeting where prospective bidders may seek technical clarification. While the bidding documents describe the general provisions relating to pre-bid meetings, no such meeting has been scheduled in the Bid Data Sheet.
In the interest of transparency, equal opportunity, and healthy competition, we respectfully request the Procuring Agency to:

Review and revise the technical specifications to make them generic and performance-based without favoring any particular brand or manufacturer. Arrange a formal pre-bid meeting.

Grievance_Letter_PAA_UVSS.pdf
Uploaded Friday, July 10, 2026 02:21 AM
Grievance Document
# Name User ID Designation Department Email Phone Role
1 Mr. Umair Naeem F00067-31-00112 Senior Joint Director Pakistan Airports Authority (PAA) miap.em.div@gmail.com +92-333-441-3914 Convener
2 Mr. Dilshad Ahmed Khan F00067-31-00114 Senior Assistant Director Pakistan Airports Authority (PAA) Dilshad.Ahmed@paa.gov.pk +92-308-713-2641 Member
3 Mr. Muhammad Abdullah Gulzar F00067-31-00101 Deputy Director Pakistan Airports Authority (PAA) abdullah.gulzar@paa.gov.pk +92-300-863-0889 Member
4 Mr. Muhammad Abbas F00067-33-00067 Assistant Director Pakistan Airports Authority (PAA) muhammad.abbas@paa.gov.pk +92-305-474-3426 Member
5 Mr. Muhammad Ali F00067-31-00134 Deputy Director Pakistan Airports Authority (PAA) rana.ali@paa.gov.pk +92-333-616-9338 Member