| Eligibility Criteria | Document |
|---|---|
| All applicable taxes shall be included in the quoted rates. Work shall be completed within stipulated time at Zonal Office Mess, N-5 North. In case of delay or substandard work, the department reserves the right to impose penalty and get the work completed at the risk and cost of the contractor as per rules. Final payment shall be subject to satisfactory inspection and completion. | |
| Work includes repair of existing stainless steel/ceramic kitchen sink along with replacement of damaged or leaking PVC/GI pipes, traps, elbows, and connectors. All joints shall be properly sealed using approved sealing material to ensure a leakage-free system. Drainage line shall be cleared and restored for smooth and proper water flow without blockage. Work shall be executed using standard quality material, ensuring durability, neat finishing, and complete functional testing. | |