Required the quotation for repair and maintenance of Office Building (Whitewashing Work with burger ICI paintext emulsion Work and New False ceiling with SMD LED Lights (2x2 Feet) P211374
Minister for Kashmir Affairs and Gilgit-Baltistan & SAFRON (Ministery of Kashmir Affairs and Gilgit-Baltistan & SAFRON) , Room No.14, Ground Floor, "S" Block Pak Secretariat
QR Code

All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.

Required Registration

NADRA CITIZENSHIP (CNIC/NICOP)

FBR (NTN)

FBR (GSTN)

Eligibility Criteria Document
All materials shall be of approved quality and shall be subject to inspection and approval by the competent authority.
Technical specifications Description Specification Ceiling tile size 2 ft × 2 ft (600 × 600 mm) Tile thickness 12–15 mm (depending on material) Tile material Gypsum Main T-grid 24 mm exposed T-section Cross T-grid 600 mm and 1200 mm Suspension GI hanger wire Perimeter angle 25 × 25 mm GI angle Access Removable ceiling tiles for maintenance Gypsum Ceiling Tile Smooth finish, suitable for offices and indoor areas
If any firms want to visit the office for inspection for above mentioned work can visits in office time (8:00 AM to 4:00 PM) before submission their rates
For whitewashing/painting work, ICI Paints Emulsion of approved quality and shade shall be used.
The contractor shall provide all necessary labor, materials, tools, machinery, equipment, and transportation required to complete the work. All work shall be executed in a professional manner to the satisfaction of the Engineer-in-Charge / Representative of the Ministry.
The contractor shall ensure proper protection of furniture, fixtures, electrical fittings, doors, windows, and other existing installations during execution.
The firms must be registered from Pakistan Engineering Council(PEC) in category C3
The firms must have technical /relevant experience of services & repair/ maintenance in their respective field at least 12 years or above.
Any damage caused during execution shall be rectified by the contractor at their own cost. The contractor shall maintain cleanliness at the site and remove all debris and leftover materials upon completion. The work shall be completed within the period specified by the department after issuance of the work order.
Payment shall be made after satisfactory completion, measurement, and verification of the work by the concerned department, subject to applicable government rules. Applicable taxes shal
Ministry has reserves the right to accept or reject any or all quotations in accordance with applicable PPRA rules.