| Eligibility Criteria | Document |
|---|---|
| Arbitration The order/contract shall be construed according to the laws of Pakistan. Any difference of opinion or dispute arising between the parties in relation to the order/contract shall be settled amicably by both the parties. If not settled, the matter shall be referred to Rector Bahria University Islamabad as sole arbitrator whose decision shall be final and binding upon both the parties. No dispute once decided by the arbitrator shall be agitated in any court of Law. | |
| Termination - The EMPLOYER may terminate the Contract by giving 14 days’ written notice if the Contractor fails to remedy performance deficiencies within the stipulated time; becomes insolvent or bankrupt; fails to comply with an arbitration decision; submits materially false statements affecting the Client’s rights; breaches the Contract or BOQ specifications; or is unable to perform substantial services for 30 days due to Force Majeure. | |
| The Contractor must have a valid Pakistan Engineering Council (PEC) registration (C-6 Category) | |
| Liquidated Damages 1% of the cost of entire order for every day up to maximum of 10 days. If work is not done even after penalty for 10 consecutive days, the university shall have the right to cancel the contract/work order and to give the contract to next lowest bidder on risk and cost of the contractor. | |
| Retention money - 5% Retention money will be withheld for the Defect Liability Period i.e One Year. | |
| Risk and Cost- If the Contractor fails to complete or abandons the Works within the stipulated or extended time, the EMPLOYER may engage another firm to complete them at the Contractor’s risk and Cost. Any additional cost shall be recovered from the Retention Money and/or Performance Security; any remaining balance, after forfeiture thereof, shall be recovered through arbitration. | |
| Defect Liability Period - a. The Contractor/Vendor shall ensure that all construction/fixing works and materials/goods supplied under this LOI are brand new and free from defects arising from design, materials, workmanship, or prevailing weather conditions. Any defect caused by the Contractor/Vendor’s act or omission shall remain its liability. b. A one-year Defect Liability Period (DLP) shall apply, commencing from the date of acceptance of the material by the end user. | |
| c. A one-year Defect Liability Period (DLP) shall apply, commencing from the date of acceptance of the material by the end user. d. The Contractor/Vendor shall provide a Defect Liability Certificate and shall, upon written notification by the Client, rectify any defect without cost within the specified period. e. If the Contractor/Vendor fails to remedy the defect within 10 days of notice, the Client may undertake remedial action at the Contractor/Vendor’s risk and cost | |
| All jobs will be approved by the Engineer-(Director P&D). | |
| The contractor will be responsible for repair/replacement of items damaged/broken during the job. | |
| Prices are to be quoted on form and format provided by Bahria University.The same is to be filled with Ball Point with hand writing in Price and Total Amount Column.All Taxes/Transportation charges etc. are to be included in the Total Cost Column. No erasing/cutting in Total Cost Column is allowed. The Grand total must be calculated arithmetically. BOQs placed as an annexure to the EPADS bidding documents shall be duly signed and stamped and submitted in original to obviate any queries. | |
| Re-typed/re-generated/Photocopied format of BoQs by Supplier/Contractor are unacceptable and will make the bid non-responsive. | |
| The contractor shall provide a three (03) year warranty for the waterproofing works of the subject project, duly executed on a minimum of Rs. 50/- stamp paper, covering any defects or leakage arising during the warranty period. | |