Procurement Lots

  • Replacement, testing & commissioning of an Indoor coil for 4 TR floor standing AC unit
    Address:Engineering E&M Maintenance Division, Main Building, State Bank of Pakistan, I.I Chundrigar Road, Aram Bagh Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province). Schedule:10 Days Quantity:2 / Job
    Qty: 2
  • Overhauling and restoration of a 4 TR scroll compressor fitted in a floor-mounted split air-conditioning system
    Address:Engineering E&M Maintenance Division, Main Building, State Bank of Pakistan, I.I Chundrigar Road, Aram Bagh Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province). Schedule:10 Days Quantity:1 / job
    Qty: 1
Eligibility Criteria Summary
Eligibility Criteria
REPLACEMENT OF INDOOR COIL OF 4 TR FLOOR STANDING AC & OVERHAULING OF COMPRESSOR INSTALLED AT UPS ROOM GROUND FLOOR MAIN BUILDING, STATE BANK OF PAKISTAN, KARACHI P183342
SBP BSC - Engineering Department (SBP Banking Services Corporation (BSC)) , Engineering E&M Maintenance Division, Main Building, State Bank of Pakistan, I.I Chundrigar Road
QR Code

All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.

Required Registration

NADRA CITIZENSHIP (CNIC/NICOP)

FBR (NTN)

FBR (GSTN)

Eligibility Criteria Document
1. Rates should be inclusive of all taxes. 2. Bid must be un-conditional, incomplete and conditional bid will be rejected. 3. Mode of Payment: 100% after completion of work. 4. Bidders are advised to visit the site before submitting quotations. By submitting the quotations, it is deemed that bidders are fully aware of site conditions and requirements. 5. Sub-Contracting is not allowed under any circumstances. 6. Contractor is responsible for the safety of his staff.
7. The Employer shall reject any bid if the recommended bidder is found to have engaged in corrupt or fraudulent practices, including bribery, collusion, or inducements during procurement. The Employer may also declare such a firm ineligible, temporarily or permanently, from participating in or executing contracts within its jurisdiction. 8. Contractors are obliged to dispose of waste and debris after approval of the Engineer In-charge.
9.Contractors are advised to make good any damages rendered during the job at their own expense, and must bring the site to original condition and state of cleanliness after job completion. 10.Bank reserve the right to reject any or all of the bids as per PPRA rules. 11.All applicable taxes levies etc shall be deducted at source from the firms payable amounts at the prevailing government rates at the time of payment. 12.In case of late completion a penalty of Rs. 5000 per day will be imposed.
The bidder must have successfully completed at least two (02) similar works during the last one (01) year, supported by relevant work orders and completion certificates or other verifiable documentary evidence.
This is to certify that the related work carried out on the equipment are covered under a six (06) months warranty from the date of completion of work.