Procurement Lots
  • Dismantling, breaking and removal of existing RCC machine foundation, including cutting and removal of reinforcement steel and embedded fixtures, using suitable tools and equipment, with due care to protect existing floor, structural members, service
    Address:54 Sharah-e-Quaid-e-Azam, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province). Schedule:10 Days Quantity:80 / cft
    Qty: 80
  • Dismantling and removal of existing terrazzo flooring, including breaking and removal of terrazzo topping and bedding layer, using suitable tools and equipment, with due care to protect existing floor slab, walls, services and surrounding finishes, i
    Address:54 Sharah-e-Quaid-e-Azam, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province). Schedule:10 Days Quantity:700 / cft
    Qty: 700
  • Complete dismantling of internal walls & other walls of toilet blocks and attached tea pantry required to be removed as per new layout plan for establishment of ladies and gents toilet block up to original RCC slab, including the removal of all doors
    Address:54 Sharah-e-Quaid-e-Azam, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province). Schedule:10Days Quantity:650 / sqft
    Qty: 650
Eligibility Criteria Summary
Eligibility Criteria
Dismantling Works at 2nd Floor, SBP Banking Services Corporation, Lahore P179397
State Bank of Pakistan (SBP), Lahore (SBP Banking Services Corporation (BSC)) , 54 Sharah-e-Quaid-e-Azam
QR Code
Bidder's Type

Any

Required Registration

NADRA CITIZENSHIP (CNIC/NICOP)

FBR (NTN)

FBR (GSTN)

Punjab (PRA)

PEC

Eligibility Criteria Document
Relevant Experience: The bidder must have relevant work experience (At least two projects of construction/repair/renovation works amounting to a minimum of Rs. 500,000/- each) in the last 01 year. Work orders/completion certificates to be attached.
Completion Time: 10 Calendar Days. Mode of Payment: 100% payment will be made after completion of job. Bidders are advised to visit the site before submitting quotations. By submitting the quotations it is deemed that bidders are fully aware of site conditions and requirements.
Sub-Contracting is not allowed under any circumstances. Contractors are bound to make good any damages rendered during the job at their own expense, and must bring the site to original condition and state of cleanliness after job completion.
Contractor is responsible for the safety of his staff and employees of the Bank during working. The contractor has to dispose off waste and debris after approval of the Engineer In-charge. Material must be of genuine origin as mentioned. Bank reserves the right to demand and check purchase documentation of the contractor to verify genuineness of material.
No price adjustment shall be made for any variation in the market prices, taxes, duties or change in wages or the Law. No advance payment shall be made by the Bank to the Contractor.
In case of late completion of the works, a penalty of Rs.1,000/- per day will be charged and deducted from the bill of the bidder.
All applicable taxes/ levies etc. as per applicable laws shall be deducted at source from the payable amounts of the firm at the prevailing government rates at the time of payment. In case of any breach of any terms & conditions, SBP-BSC reserves right to take punitive action for which decision of the Chief Manger shall be conclusive.
If any dispute arises between the parties (the firm & the Employer), the matter shall be referred to the Chief Manger who will examine the matter in detail and give the decision which will be final and binding upon the parties.
The bidder must be registered with Pakistan Engineering Council (PEC). Registration certificated must be attached.

⏳ Time Left for Bid Submission Deadline

00
Days
00
Hours
00
Minutes
00
Seconds