Procurement Lots

  • Cisco 3850 24 Ports UPOE Switch
    Address:Procurement Office, Faculty Block II, 2nd Floor, Park Road, Tarlai Kalan, Islamabad, Islamabad Capital Territory Schedule:Days10 Quantity:1 / Qty
    Qty: 1
  • D-Link Ethernet Cable Roll
    Address:Procurement Office, Faculty Block II, 2nd Floor, Park Road, Tarlai Kalan, Islamabad, Islamabad Capital Territory Schedule:10Days Quantity:1 / Qty
    Qty: 1
  • Face Plate with Single I/O port D-Link/3M
    Address:Procurement Office, Faculty Block II, 2nd Floor, Park Road, Tarlai Kalan, Islamabad, Islamabad Capital Territory Schedule:10Days Quantity:6 / Qty
    Qty: 6
  • Network I/Os D-Link/3M
    Address:Procurement Office, Faculty Block II, 2nd Floor, Park Road, Tarlai Kalan, Islamabad, Islamabad Capital Territory Schedule:10 Days Quantity:12 / Qty
    Qty: 12
Eligibility Criteria Summary
Eligibility Criteria
82312-Procurement of Networking Equipment and Accessories for the Provision of Wired Internet Connectivity P162387
comsats university Islamabad (Islamabad Campus) (Comsats University, Islamabad) , Procurement Office, Faculty Block II, 2nd Floor, Park Road, Tarlai Kalan, Islamabad
QR Code
Bidder's Type

Any

Required Registration

NADRA CITIZENSHIP (CNIC/NICOP)

FBR (NTN)

FBR (GSTN)

Eligibility Criteria Document
The procurement method/mode is on a lot basis, However, the participating bidder should be required to provide an item-wise price breakup (Quotation on letter head) in PKR for each quoted item at the time of uploading. And it is (mandatory).
6. The participating bidder shall provide/attach separate and valid proof/documents of FBR GSTN (GST Registration Number) and FBR NTN (National Tax Number), along with their updated status/position separately. In case of non-compliance, failure to provide the required documents, or submission of invalid/outdated information, the bidder shall be declared Non-Responsive/Disqualified
The bidder must attach a valid FBR ATL/NTN certificate for the current month; otherwise, the bid shall be disqualified
Attached certificate that in case of successful bidder and refusal to accept the LOA or after acceptance, refusal to take up the job. I am in consent that CUI would impose BAN from business with my firm for period of One Year effective immediate

⏳ Time Left for Bid Submission Deadline

00
Days
00
Hours
00
Minutes
00
Seconds